-- Panhead and Flathead site --

Panhead and Flathead Board Gallery

The Independent Gallery for Panheads, Flatheads, Knuckleheads and others


Home Upload file Login
Panhead & Flathead Board Album list Last uploads Last comments Most viewed Top rated My Favorites By date Search
Home > Old Stuff > Factory Pictures
1948 wiring routing
Attached is an extract from the 48 factory to dealer new model announcement. All the big twins shown (E, F or U) show the same routing. Routing likely changed in 49 because the hydraglide fork stops would hit the loom if routed like this ... Perry

1948 wiring routing

Attached is an extract from the 48 factory to dealer new model announcement. All the big twins shown (E, F or U) show the same routing. Routing likely changed in 49 because the hydraglide fork stops would hit the loom if routed like this ... Perry

File information
Album name:Perry Ruiter / Factory Pictures
Date added:Jan 04, 2021
Displayed:231 times
URL:https://www.hydra-glide.net/cpg/displayimage.php?pid=9660
Favorites:Add to Favorites
Copyright © 2001-2024 Panhead/PTH